Project Beacon — 190 ft (58 m)  ·  Ulstein design  ·  DNV  ·  1999 Norwegian emergency-response & rescue vessel expedition conversion candidate
Expedition Conversion Candidate

Project Beacon

58-Metre Norwegian ERRV — Compact Expedition Conversion

190 ft (58 m) · Ulstein Design · Built 1999 · DNV · Norway

Why This Hull

Advantages of this platform

ERRV
Rescue-Rated Hull

A Norwegian emergency-response & rescue vessel — fast-rescue-craft davits, a rescue zone and temporary-refuge capability already engineered in.

ULSTEIN
Norwegian Sea Boat

An Ulstein-design North Sea hull built for hard weather and long standby — proven seakeeping in a compact package.

58 m
Manageable Size

190 ft is the sweet spot — serious ocean capability at a size an owner can run without a small-ship crew or a superyacht budget.

B&B
Explorer Concept

A Bassan & Benedetti conversion concept for this hull is available to registered principals — owner decks above a working aft deck.

A compact, rescue-rated Norwegian hull — the ocean pedigree and the deck are already there, in a size that stays manageable.

Mission Capability

What this platform can carry and do

Standard capability is built into the hull today; optional systems are engineered in during conversion.

Rescue & Fast Craft
Deck Crane
ROV Capable
Dive OperationsOption
Extended-Range Tanks
Passengers 12–16
SubmersibleOption
Touch-&-Go PadOption
Ship's HospitalOption
Tender & Toy Deck
The Conversion Vision · A Few Changes

Re-imagined above the waterline

A conversion is far more than a technical upgrade. It is the transformation of a proven, ocean-tested hull into a yacht with new purpose, new value and a life of its own — and it rewards the owner who can see what others cannot.

The hull, machinery and class are proven. The conversion re-imagines everything above and around them for owner-standard expedition or shadow-vessel service. In outline, the scope includes:

Climate, Coatings & Ship Systems

  • HVAC engineered for weather extremes — tropical heat to polar cold
  • Overhaul and upgrade of all ship systems
  • Advanced waste and sewage treatment
  • Upgraded fresh-water makers and fuel polishing
  • New topside paint and underwater hull coatings

Bridge, IT, Comms & Security

  • New bridge electronics, navigation and communications
  • Satellite link to the shoreside management team
  • Ship-wide Wi-Fi and integrated entertainment systems
  • All-digital, remotely-monitored maintenance and ship procedures
  • Enhanced security — video surveillance and perimeter alarms

Owner & Guest

  • New owner's suite and guest staterooms
  • Jacuzzi and beach club
  • Spa facilities — sauna and steam
  • Integrated entertainment and cinema

Expedition, Dive & Water Sports

  • Hull openings for beach club, tender launch & retrieval, and ROV / submarine handling
  • Special dive equipment; option for full dive operations
  • Retained rescue craft for tender and expedition duty

Crew, Galley & Service

  • Upgraded crew quarters and mess
  • Gourmet galley and meal-prep upgrades; new pantries
  • Upgraded ship's laundry
The Conversion · Rendered

The support conversion, re-imagined

Grant Maughan's support-conversion study for a sister-class Norwegian ERRV — illustrative of the design approach for Project Beacon: a helideck, tender and toy handling, a beach club and owner decks above a working aft deck.

Beacon conversion concept — full profile of a converted support explorerBeacon conversion concept — bow quarter with helideck and tendersBeacon conversion concept — aft working deck with tenders and craneBeacon conversion concept — clean support-vessel profile

Illustrative support-conversion renderings of a sister-class ERRV — Grant Maughan Design. Indicative of the design approach; a Beacon-specific concept is developed to owner specification.

The Platform · As She Lies Today

The vessel today

The hull as she operates now — a rescue-rated Norwegian sea boat, at home in high latitudes.

Project Beacon — Norwegian ERRV broadside against snow-capped mountainsProject Beacon — bow view alongside in a Norwegian portProject Beacon — the vessel alongside at nightProject Beacon — underway at dusk
The Yacht Channel

Walkthrough

The Yacht Channel · Project Beacon — the compact ERRV conversion

Registered Access

Full specifications & pricing

Detailed specifications, the general arrangement, the Bassan & Benedetti conversion concept, pricing and the complete gallery are released to registered principals. Register your mission brief — it goes straight to Paul M. Madden.

Detailed specification table General arrangement Conversion pricing Full gallery
Register to Unlock Full Details & Pricing

Already registered on this device? The details unlock automatically.

The Vessel · As She Lies Today

Detailed specifications

TypeEmergency-response & rescue vessel (ERRV) / standby-supply
Built1999 · Ulstein design, Norway
Class / FlagDNV · Norway
LOA58 m (190 ft)
Beam (approx.)≈ 14 m
PropulsionTwin diesel · CP propellers · bow thruster
Rescue CapabilityFast-rescue craft & davits · rescue zone · temporary refuge
Deck CraneHydraulic deck crane
Working DeckAft working deck for tenders, toys & handling gear
Accommodation≈ 18–20 berths (as built)

Principal particulars indicative, pending the full class and build record; all figures to be confirmed at pre-purchase survey. Complete specification released to registered principals.

Pricing & Investment

Conversion investment

On Request
Vessel Price

Call or register at XplorerYachts.com

$10–20M
Conversion — Yacht Support

Safe, comfortable expedition ops

$20–40M
Conversion — Global Explorer Yacht

Full owner-standard build

Vessel pricing is provided on application. Commercial-vessel prices move with charter and market conditions, so we do not publish them — contact Xplorer Yachts or register at XplorerYachts.com for current pricing. Conversion scope, and therefore cost, ranges from a yacht-support refit to a full global explorer yacht; a comparable new build is 36+ months.

General Arrangement

Deck plans

The general arrangement and the Bassan & Benedetti conversion concept for Project Beacon are released to registered principals on request.

Request the Full Brochure & GA Set The Conversion Process